Get the Right Mining & Conveyor Solution

Tell us your requirements. Our team will help match suitable mining support or conveyor solutions for your project.

factory

Factory-Direct Supply

Direct manufacturer pricing

engineering

Custom Engineering

Specifications matched to your project

verified

Stable Quality Control

Material & dimension inspection

public

Global Export Support

Logistics & after-sales

Tell Us About Your Project

Share your requirements and our team will contact you with suitable specifications and quotation support.

Complete the security verification to enable submission.
lock Confidential project info
Module 0 - Header Navigation
Module 1 - Banner
China Resin Capsules Factory

Resin Capsules for Mining, Tunnel & Rock Bolting Projects

Fast-curing resin anchoring capsules designed for reliable bonding, high anchor capacity and efficient installation in mine roadways, tunnels, roof bolting and cable bolting systems.

bolt

Fast Curing

straighten

High Anchor Capacity

timer

Multiple Gel Times

construction

Mine & Tunnel Support

Get factory-direct resin capsules for your mining, tunnel and rock bolting projects.

Module 2 - What Is Section

A Combined Rock Bolt System for Immediate Support and Permanent Reinforcement

Cuttable Combination Rock Bolt is an integrated ground support system combining mechanical point anchoring and full-length grouting anchorage for underground engineering projects. It ensures safety and speeds up construction cycles.

Combination Rock Bolt System

CT-Bolt combines two support mechanisms in one bolt system: immediate mechanical anchoring and long-term grouted reinforcement.

Combination Support Two-Stage System Underground Reinforcement

Mechanical Point Anchoring

The expansion anchor head is activated by pre-tensioning, forming a reliable point anchorage with the borehole wall immediately after installation.

Immediate Support Expansion Anchor No Curing Wait

Full-Length Grouting Anchorage

After installation, grout can be injected through the bolt system to fill the gap between bolt and borehole, creating a permanent full-length anchoring structure.

Post-Grouting Full-Length Bonding Permanent Support

ONE BOLT SYSTEM, TWO SUPPORT STAGES

CT-Bolt provides immediate mechanical anchoring for early ground control and full-length grouting reinforcement for long-term underground stability.

Immediate Anchoring Post-Grouting Permanent Support Ground Stability

Ready to upgrade your underground support system?

Learn More
Module 3 - Problems We Solve Module 3 - Problems We Solve

Common Ground Support Problems in Tunneling, TBM Excavation and Permanent Underground Projects

Traditional rock bolt systems often slow down construction, interrupt excavation rhythm, restrict TBM operations, and create long-term durability concerns in demanding underground environments.

Waiting for Grout Curing

Traditional grouted rock bolts require curing time, delaying support activation. Result: Support cannot work immediately.

Support and Excavation Cannot Run in Parallel

Coordination is hard when waiting for curing. Result: Construction rhythm becomes slower.

Steel Bolts Limit TBM Cutting

Steel bolts interfere with TBM cutterheads. Result: Higher cutterhead risk.

Long-Term Durability Risk

Corrosion risks in harsh environments. Result: Reliability reduced.

High Maintenance Costs

Frequent inspections and repairs required for non-integrated systems. Result: Increased operational expenditure.

Complex Installation Logistics

Managing multiple components and curing stages complicates site management. Result: Higher logistical overhead.

Why these problems matter

Get Technical Solutions
Module 4 - Why CT-Bolt Matters

Why CT-Bolt Is Valuable for Modern Underground Support Projects

CT-Bolt combines immediate mechanical anchoring with long-term grouted reinforcement, improving safety and efficiency.

Immediate Load-Bearing Support

Works immediately without waiting for grout curing. Immediate Support, No Curing Wait.

Post-Grouting for Permanent Reinforcement

Creates full-length anchorage for structural stability. Post-Grouting, Permanent Support.

Support and Excavation Parallelism

Faster workflow coordination. Faster Workflow, Parallel Operation.

Active Ground Control

Controls rock earlier to reduce loosening risk. Ground Stability, Active Control.

Cost-Effective Lifecycle

Reduced maintenance and faster cycles lower total project costs. Value: Lower OpEx.

Streamlined Logistics

All-in-one system simplifies transportation and on-site handling. Value: Logistical Efficiency.

Why CT-Bolt matters in underground engineering

View Technical Advantages
Module 5 - Working Principle

How CT-Bolt Works from Immediate Anchoring to Permanent Grouted Support

CT-Bolt works in two stages: immediate mechanical point anchoring after installation, followed by full-length post-grouting reinforcement for long-term underground stability.

Stage 1: Immediate Point Anchoring

ACTIVE SUPPORT
  • Insert: Position the bolt within the pre-drilled borehole.

  • Activate Expansion Head: Torquing the nut expands the head against rock walls.

  • Apply Pre-Tension: Tensioning provides active pressure to stabilize fractures.

Result: Immediate load-bearing capacity secured upon installation.

Expansion Anchor Head Pre-Tension Activation Immediate Load-Bearing

Stage 2: Full-Length Grouting

PERMANENT SUPPORT
  • Connect Grouting: Utilize the specialized hemispherical nut for grout injection.

  • Inject Grout: Fill the borehole and the hollow core for full bonding.

  • Form Permanent Anchorage: Hardened grout creates a monolithic structure.

Result: System upgrades to permanent, corrosion-resistant support.

Post-Grouting Full-Length Bonding Permanent Support
1

Drill

2

Install/Anchor

3

Early Control

4

Inject Grout

5

Permanent

Discover how our two-stage system optimizes your workflow

Learn More About Principle
Module 6 - Product Series

CT-Bolt Options for Immediate Support, TBM Compatibility and Permanent Ground Reinforcement

We provide multiple Cuttable Combination Rock Bolt solutions for standard underground support, TBM tunneling, corrosion-resistant applications, and project-specific permanent reinforcement requirements.

Steel CT-M20

Standard high-tensile steel CT-Bolt designed for versatile ground control and reliable point anchoring.

General Support Immediate
View Details

Steel CT-M22

Higher-capacity structural steel variant engineered for heavy-duty tunnel support and deep rock reinforcement.

Higher Capacity Permanent
View Details

GFRP Cuttable CT Bolt

Glass Fiber Reinforced Polymer body, providing a TBM-friendly solution that can be easily excavated.

GFRP Body TBM Cuttable
View Details

TBM Cuttable CT Bolt

Specialized construction solution for TBM projects, ensuring continuous advance without cutter head damage.

TBM Tunneling Construction
View Details

Anti-Corrosion CT Bolt

Enhanced coating technology for corrosive mining environments, ensuring 50+ years of design life.

Corrosion Protection Long Life
View Details

Project-Custom CT Bolt

Tailor-made bolt specifications for unique geotechnical conditions or specific project requirements.

Custom Design Engineering
Send Requirements

Not Sure Which CT-Bolt Fits Your Project?

Get Product Recommendation
Module 7 - System Components

Integrated CT-Bolt Components for Immediate Anchoring and Long-Term Grouting Support

The Cuttable Combination (CT) Rock Bolt is engineered for high-performance ground support in mining and tunneling. Its dual-function design provides immediate point-anchor stability and full-length permanent grouted reinforcement.

SCHEMATIC 07-A

Steel / GFRP Bolt Body

Available in high-tensile steel or cuttable Glass Fiber Reinforced Polymer (GFRP) for TBM excavation compatibility.

End Expansion Anchor Head

Mechanical expansion mechanism that provides immediate load-bearing capacity upon installation torque.

Polyethylene Sheath

Corrosion protection layer that ensures the integrity of the bolt body in aggressive acidic or saline environments.

Grouting Interface

Precision-engineered inlet for high-pressure grout injection to fill the annulus and rock fractures.

Plate

Heavy-duty load distribution plate designed to conform to uneven rock surfaces and maintain surface tension.

Anchoring Nut

High-torque drive nut that activates the expansion anchor and secures the bearing plate against the rock face.

Need a detailed structural breakdown for your engineering submittal? Download our full component documentation.

Request Component Data Sheet
Module 8 - Technical Specifications

Steel CT-M20 / CT-M22 and GFRP Cuttable CT-Bolt Specification System

Select the optimal anchoring system based on ground conditions, required load capacity, and excavation methodology. All specifications meet ISO standards for mining equipment.

Standard Mining

Steel CT-M20

Yield Load 160 kN
Ultimate Load 230 kN
Borehole Ø 33-38 mm
View Profile
Primary Choice
Heavy Duty

Steel CT-M22

Yield Load 210 kN
Ultimate Load 300 kN
Borehole Ø 35-42 mm
Select Model
Excavation Safe

GFRP Cuttable

Yield Load 140 kN
Ultimate Load 200 kN
Borehole Ø 30-35 mm
View Profile
Specification Parameter CT-M20 CT-M22 CT-GFRP
Material Grade B500B / Gr 75 B500B / Gr 75 Composite
Elongation (%) ≥ 12% ≥ 12% ≤ 2%
Outer Ø (mm) 20 mm 22 mm 25 mm
Thread Pitch R20/10 R22/10 Full Thread
Corrosion Prot. Galvanized/PE Galvanized/PE Inherent
Matching Environment: High Seismic Risk Aggressive Water Inflow Temporary TBM Access Weak Strata/Soft Rock

Configure your custom bolt system today. Our engineering team can customize length, thread type, and coating based on your specific geological survey data.

Get Engineering Quote
Module 9 - TBM Cuttable Solution

A GFRP Cuttable CT-Bolt System Designed for TBM Tunneling and Advance Ground Support

The GFRP Cuttable CT-Bolt is engineered for tunneling projects where advance support is required before TBM breakthrough, while maintaining cutterhead-friendly cutting performance.

GFRP Cuttable Body

High-strength GFRP material allows for structural support while being easily sheared by TBM cutters.

Direct Cutterhead Cutting

Cutterhead can directly pass through the supported zone without halting excavation cycles.

Reduced Equipment Risk

Significant reduction in tool wear and risk of damage to the TBM cutterhead disc cutters.

Advance Support

Ideal for providing immediate stability in unstable faces, faults, and broken geological zones.

ENGINEERING SPECIFICATION

GFRP Mechanical Strength: 1000+ MPa tensile strength, maintaining cuttable ductility for TBM interference.

TBM EXCAVATION CONTINUITY WORKFLOW

01

Identify Weak Ground

02

Install GFRP CT-Bolt

03

Maintain Ground Stability

04

TBM Cutterhead Cuts Through

05

Continue Tunneling

This solution helps combine advance support needs with TBM excavation continuity in complex tunneling conditions.

Learn More About TBM Solutions
Module 10 - Corrosion Protection

Multi-Layer Protection System for Long-Term Underground Service Life

CT-Bolt can be designed with polyethylene sheath protection, grouted encapsulation, and different surface treatment options to improve durability.

Black Steel Option

Standard high-tensile steel for temporary applications or environments with minimal corrosion risk.

Hot-Dip Galvanized

Enhanced protection for humid and moderately corrosive underground environments according to ISO 1461.

Combi Coat® Composite

The ultimate epoxy-powder coating system for extremely high-corrosion or permanent support infrastructure.

Double Protection

PE Sheath combined with grouted encapsulation provides 50-150 years of design service life.

Designed for long-term underground durability in water tunnels, sewage tunnels, and permanent caverns.

Request Durability Data
Module 11 - Installation Flow
Installation Flow Background

Standard CT-Bolt Installation Process from Drilling to Post-Grouting

A sophisticated two-stage logic ensuring immediate excavation support followed by permanent structural reinforcement through high-pressure grouting.

01. Borehole Drilling

Percussive or rotary drilling to specified depth and diameter in rock mass.

02. Depth Allowance

Verification of hole cleanliness and depth to accommodate the full bolt length.

03. Bolt Insertion

Manual or mechanized insertion of the CT-Bolt assembly into the prepared borehole.

04. Immediate Mechanical Anchoring

Expansion of the anchor head providing instantaneous point-anchor support.

05. Pre-Tension and Plate Contact

Tightening the nut to compress the bearing plate against the rock surface.

06. Post-Grouting Operation

Injection of cementitious grout through the tube to fully encapsulate the bolt.

INSTALLATION TORQUE: 200-300Nm
HOLE DIAMETER: 44-51mm
STEEL GRADE: B500NC / S460

From Immediate Support to Permanent Reinforcement

View Installation Guide
Module 12 - Quality Control

Reliable CT-Bolt Quality Control from Factory Inspection to Grouting Verification

Ensure maximum safety and long-term performance with our rigorous quality control and precise grouting verification processes.

Immediate Anchoring

Testing of mechanical expansion torque to ensure reliability before grouting phases.

Grouting Channels

Internal inspection of the injection tube to ensure unobstructed fluid flow through the bolt.

Reverse Filling

Validation of the bottom-up filling sequence to eliminate air pockets and ensure full encapsulation.

Grout Overflow Check

Visual confirmation of grout exiting the borehole mouth as a proxy for successful filling.

Dimension Inspection

Rigorous geometric checks on thread precision, sleeve thickness, and anchor head expansion.

Batch Consistency

Material traceability and heat number tracking for every production lot to ISO standards.

GROUTING VERIFICATION PROCESS FLOW

1

Injection Start

Pump connection

2

Tube Filling

Internal flow

3

Bottom Entry

Rock contact

4

Upward Rise

Annulus filling

5

Overflow

Full verification

QUALITY CONTROL FOR RELIABLE PERMANENT SUPPORT

Download QC Manual
Module 14 - Project References

Combination Rock Bolt Application Scenarios

Providing robust dual-stage reinforcement across diverse global infrastructure and mining environments where standard support systems fall short.

Heavy Load Extraction

Deep Hard Rock Mining

Supplying immediate stability to drifts under intense lithostatic pressure, enabling continuous advancement in deep-level extraction zones without waiting for grout to cure.

View Application
High Convergence

Squeezing Ground Tunnels

Pre-tensioned mechanical anchors control early rock deformation, followed by full-grouting to solidify the surrounding weak strata and prevent long-term structural failure.

View Application
Corrosive Environments

Subsea Tunnel Projects

Dual protection utilizing polyethylene sleeves and high-grade grout encapsulation to guarantee permanent structural integrity against high-pressure saline groundwater.

View Application
Mechanized Excavation

TBM Fault Zone Recovery

Rapid deployment of GFRP cuttable variants allows crews to secure collapsible rock faces ahead of the TBM without damaging cutterheads during forward progress.

View Application
Large Span Cavities

Hydropower Caverns

Creating deep, permanent anchorage points in massive subterranean power stations to prevent arch collapse during sequential cavern enlargement.

View Application
Variable Geology

Mountain Highway Tunnels

Reliable reinforcement for drill-and-blast operations transitioning between hard granite and weathered rock bands, ensuring consistent progression safety.

View Application

Need to assess whether combination rock bolts fit your specific geological challenges?

Request Project Consultation
Module 15 - Inquiry Form

Get Custom CT-Bolt Solutions Directly from China Factory

Send us your tunnel type, borehole size, support depth, or TBM cutting requirements. Our engineering team will help recommend a suitable Cuttable Combination Rock Bolt solution.

ENGINEERING ADVANTAGES
  • factory

    Factory Direct CT-Bolt Supply

    Direct communication with a China manufacturer for faster quotation and direct-from-source pricing.

  • construction

    Steel & GFRP Options

    Steel CT-M20/M22 and GFRP cuttable options tailored for TBM and permanent ground support.

  • architecture

    Tailored Geotechnical Support

    Bespoke bolt lengths, diameters, and coatings engineered for weak rock, caverns, and mining roadways.

  • verified

    Technical & Export Support

    Comprehensive support for batch inspection, test reports, and global project delivery.

Request Direct Factory Quotation

Connect directly with our engineering team to get custom-designed solutions that minimize downtime and cut procurement costs.

Complete the security verification to enable submission.
China-based CT-Bolt manufacturer supporting global mining & tunneling projects.
bolt Fast Response
precision_manufacturing Factory Support
architecture Custom Design
public Global Supply